This is the basic framing of the secondary Hull. The Top Dome, the Trench Box, and the Bottom Dome. The dark brown material is a plastic product that will be cut into sections that will fill in between the framing. Once installed, the Secondary hull will be ground down and sanded into shape.
Loading...